In the past years of experiences, we have completed projects / maintenances with our premium clients as follow:
Our Clients
Track Records
2021 |
Strengthening Of Taxiway Base At Singapore Changi Airport
Emergency Core Response On 24/7(24Hrs Standby) At Singapore Changi Airport(Main Contractor: Ley Choon Constructions & Engineering Pte Ltd) (Main Contractor: Samsung-Koh Brothers Joint Venture)
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Pawai/Murai/Pulau Sudong
Supply & Installation:(Main Contractor: ST Synthesis Pte Ltd) To Carry Out LT Panel Replacement for Airfield Lighting Control Centre(ACC)@ACC1,ACC2,ACC3&ACC4 - AFL LCR - TAB To Replace Sudong Runway Lighting to LED Lights - Pulau Sudong Supply Deliver of S4GA ALCMS for Pulau Sudong Airfield - Pulau Sudong Supply, Deliver and installation of S4GA lightings at Sudong Airfield 53 x Elevated Lights 05 x UR3 01 x UR101 01 x Solar Engine - Pulau Sudong |
2020 |
Strengthening Of Taxiway Base At Singapore Changi Airport
Emergency Core Response On 24/7(24Hrs Standby) At Singapore Changi Airport
(Main Contractor: Samsung-Koh Brothers Joint Venture)(Main Contractor: Ley Choon Constructions & Engineering Pte Ltd)
Supply & Installation Of Identification Beacon For Cargo Agent Building ‘E’ At Singapore Changi Airport
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Pawai/Murai/Pulau Sudong
(Main Contractor: ST Synthesis Pte Ltd)(Main Contractor: Changi Airport Group) Supply & Installation: Abbreviated Precision Approach Path Indicator(PAPI) - TAB Supply, Deliver and Install 18 SFL FCU and Accessories Replacement of LED Light Fitting at D7/D8 Replacement of LED IDENIFICATION BEACON LIGHT at Caravan Site 05, Airfield of Sembawang Air Base (Client: Defence Science & Technology Agency (DSTA)
Rectify T2 Low Insulation Cable and Verify T1 Circuit Cables
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – Changi Airbase West (CABW)(Main Contractor: Inspiration Design Construction Pte Ltd) (Main Contractor: SMM Pte Ltd – Member of Surbana Jurong Group) Supply, Deliver and Installation of Traffic Lights and M4 & M5 Crossing of CABW
Resurfacing Of Airfield Pavements, Upgrading Of Airfield Lighting Systems & Ancillary Works In Tengah-Project
Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)(Main Contractor: Samwoh Corporation Pte Ltd) (Main Contractor: UEMS Solutions Pte Ltd) |
2019 |
Strengthening Of Taxiway Base At Singapore Changi Airport (Main Contractor: Ley Choon Constructions & Engineering Pte Ltd)
Emergency Core Response On 24/7(24Hrs Standby) At Singapore Changi Airport
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Pawai/Murai/Pulau Sudong(Main Contractor: Samsung-Koh Brothers Joint Venture) (Main Contractor: ST Synthesis Pte Ltd) Supply, Deliver and Installation of Distance to go Marker(DTGM)at Palau Sudong Runway Supply, Deliver and Installation of Wind Cone Mast in TAB, Murai and Sudong Runway Supply, Deliver and Installation of Southern Approach Mast in Tengah Air Base Supply, Deliver and Installation of 18 & 36 Runway PAPI Lights Supply, Deliver and Installation of Primary Cable in November Tango and Sierra Tango Taxiways in TAB
Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor: UEMS Solutions Pte Ltd) Supply & Installation of LED Identification Beacon Lights at Seletar Airport (Main Contractor: Engie Services Singapore Pte Ltd) |
2018 |
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Pawai/Murai/Pulau Sudong (Main Contractor: ST Synthesis Pte Ltd) Supply & Installation of: Replacement 29 sets of MCR3, inclusive of Testing & Commissioning – Tengah Airbase (TAB) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
Emergency Core Response On 24/7(24Hrs Standby) At Singapore Changi Airport (Main Contractor: UEMS Solutions Pte Ltd) (Main Contractor: Samsung-Koh Brothers Joint Venture) |
2017 |
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works TAB/Pawai/Murai/Pulau Sudong
(Main Contractor: ST Synthesis Pte Ltd) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor: UEMS Solutions Pte Ltd) Emergency Core Response On 24/7(24Hrs Standby) At Singapore Changi Airport
(Main Contractor: Samsung-Koh Brothers Joint Venture) Installation Of CPS, MS Servers And Workstations For A-SMCGS Phase 1 & 1A At Singapore Changi Airport
(Main Contractor: NCS Communications Engineering Pte Ltd) To Supply, Deliver & Install Taxiway Centre Light At Singapore Seletar Airport
(Main Contractor: Indeco Engineers Pte Ltd Installation, Testing & Commissioning of Airfield Lightings at A6/A7 & NC3 Junction for Resurfacing Work
(Main Contractor: Multiform Developments and Construction Pte Ltd) |
2016 |
To Supply, Deliver & Install Taxiway Centre Light At Singapore Seletar Airport
(Main Contractor: Indeco Engineers Pte Ltd) Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Pawai/Murai/Pulau Sudong
(Main Contractor: ST Synthesis Pte Ltd) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor: SMM Pte Ltd) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor: UEMS Solutions Pte Ltd) Emergency Core Response On 24/7(24Hrs Standby) At Singapore Changi Airport
(Main Contractor: Samsung-Koh Brothers Joint Venture) HT Ducting Taxiway Closure & Opening Work(Phase2,3,&4)@Singapore Changi Airport
(Main Contractor: Trans Equatorial Engineering Pte Ltd) Supply, Deliver and Install Precision Approach Path Indicator (PAPI) – Pulau Sudong
(Main Contractor: ST Synthesis Pte Ltd) Fence Lighting Installation Works At East Cargo – Singapore Changi Airport
(Main Contractor: Quek & Quek Civil Engineering Pte Ltd) Supply, Deliver and Install Taxiway Inset Blue Edge Lights at M4 – Changi Airbase West (CAB)
(Main Contractor: Inspiration Design Construction Pte Ltd) |
2015 |
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Pawai/Murai/Pulau Sudong
(Main Contractor: ST Synthesis Pte Ltd) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor: SMM Pte Ltd) Proposed Construction of New Aircraft Parking Stands, Reconfiguration Of Engine Run Up Bay And Associated Aircraft Pavement Works At East Cargo – Singapore Changi Airport
(Main Contractor: Quek & Quek Civil Engineering Pte Ltd) Resurfacing Of Taxiway For Airfield Lighting System Works At Singapore Changi Airport
(Main Contractor: Ley Choon Constructions & Engineering Pte Ltd) |
2014 |
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Pawai/Murai/Pulau Sudong
(Main Contractor: ST Synthesis Pte Ltd) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor: SMM Pte Ltd) Replacement Of High Tension Cabling Works At Singapore Changi Airport
(Main Contractor: Guthrie Engineering (S) Pte Ltd) High Tension Cabling Works Associated At Former South End Reservoir Site At Singapore Changi Airport
(Main Contractor: Hock Lian Seng Infrastructure Pte Ltd) |
2013 |
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Pawai/Murai/Pulau Sudong
(Main Contractor: ST Synthesis Pte Ltd) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor: SMM Pte Ltd) Design, Supply, Installation & Commissioning Of CAT 1 Approach Lighting At Seletar Airport
(Main Contractor: Guthrie Engineering (S) Pte Ltd) |
2012 |
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Pawai/Murai/Pulau Sudong
(Main Contractor: ST Synthesis Pte Ltd) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor: SMM Pte Ltd) Airfield Lighting And Electrical Works For Construction Of East (North) Aircraft Parking Apron, Associated Taxiways And Ancillary Works At Seletar Airport
(Main Contractor: Or Kim Peow Contractors Pte. Ltd) Sub-Contract For Removal, Servicing, Reinstallation, Testing And Commissioning, Maintenance Of Airfield Lighting System For Resurfacing Of Taxiway EP Between E8 And E9 At Singapore Changi Airport
(Main Contractor: Ley Choon Constructions And Engineering Pte Ltd) Nominated Sub-Contract For the Supply, Deliver, Removal, Reinstallation, Testing And Commissioning Of Airfield Lighting System For Resurfacing Of Taxiway At Singapore Changi Airport
(Main Contractor: Ley Choon Constructions And Engineering Pte Ltd) Construction Of Runway South End At Seletar Airport, Electrical Works For LLZ Building
(Main Contractor: Hwa Seng Builder Pte Ltd) |
2011 |
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Pawai/Murai/Pulau Sudong
(Main Contractor: Guthrie Engineering (S) Pte Ltd) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor: SMM Pte Ltd) Airfield Lighting And Electrical Works For Construction Of Runway South End At Seletar Airport
(Main Contractor: Hwa Seng Builders Pte Ltd) |
2010 |
Guidance Signs Installation Works At Changi Airport
(Main Contractors: Guthrie Engineering (S) Pte Ltd) Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Pawai/Murai/Pulau Sudong
(Main Contractor: Guthrie Engineering (S) Pte Ltd) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor: SMM Pte Ltd) Nominated Sub Contract For Supply, Installation,Testing And Commissioning For Airfield Lighting System For The Construction Of East(South) Aircraft Parking Apron, Associated Taxiways And Ancillary Works At Seletar Airport
(Main Contractor: Ley Choon Constructions And Engineering Pte Ltd) |
2009 |
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Pawai/Murai/Pulau Sudong
(Main Contractor: Guthrie Engineering (S) Pte Ltd) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor : SMM Pte Ltd) Airfield Lighting Works For Runway Extension At Seletar Airport
(Main Contractor : Eng Seng Construction Pte Ltd) 2nd Stage Sub-Contract To Supply, Deliver, Remove ,Reinstall, Testing & Commissioning Of Airfield Lighting System For Resurfacing Of Taxiways At Singapore Changi Airport
(Main Contractor : Ley Choon Constructions And Engineering Pte Ltd) |
2008 |
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Pawai/Murai/Pulau Sudong
(Main Contractor: Guthrie Engineering (S) Pte Ltd) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor: SMM Pte Ltd) Supply, Deliver, Installation, Testing & Commissioning Of Airfield System For New Entrance Taxiway At Northern End Of Runway At Singapore Changi Airport
(Main Contractor: Quek & Quek Civil Engineering Pte Ltd) |
2007 |
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Murai
(Main Contractor: Guthrie Engineering (S) Pte Ltd) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor: SMM Pte Ltd) Sub-Contract For Airfield Cable Diversion Works At Singapore Changi Airport
(Main Contractor: Quek & Quek Civil Engineering Pte Ltd) |
2006 |
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Murai
(Main Contractor: Guthrie Engineering (S) Pte Ltd) Maintenance Contract For Airfield Ground Lighting Works – Singapore Youth Flying Club (SYFC)
(Main Contractor: United Premas Ltd) CCTV Installation Works For Town Councils
(Main Contractor: Cisco Security Pte Ltd) |
2005 |
Maintenance Work/Improvement Work Contract For Airfield Ground Lighting Works – TAB/Murai
(Main Contractor: Guthrie Engineering (S) Pte Ltd) Laying Of LT/LV Cable, Installation Of Street Lighting, And Electrical Work for Sub-Station At Istana
(Main Contractor: O’Connor’s Singapore Pte Ltd) |
2004 |
Carry Out PAPI Installation, Simple Approach Lighting, Runway Threshold Identification Light(RTIL) Installation, Turn Pad & Edge Light Installation Works At Seletar Airport Improvement Works
(Main Contractor: Hao Da Pte Ltd) |
2003 |
Approach Lighting Installation, Sequential Flash Lights, PAPI Installation, Runway/Taxiways Edge Lights and CCRs Installation Works At Tengah Airbase
(Main Contractor: Chye Joo Construction Pte Ltd) Runway 1 & Runway 2, Approach Lighting And Sequential Flash Light (SFL) Installation Works At Singapore Changi Airport
(Main Contractor: Guthrie Engineering (S) Pte Ltd) |